Saturday, January 22, 2011

V-Band

Some more shots of fitting the carb with a v-band. I machined a bit of the inside of the clamp out then began the 45 minute welding process. In order to weld the carb body without it warping I ran about a 1/2" bead of weld, then cooled the unit with compressed air, then move to the other side and to the same.
In the end everything worked out great.



1 comment: